Wednesday, November 29, 2006

Knitting Check-in: 5 weeks until Christmas

Thanks the long, slow, snowy drive back to Seattle from the Thanksgiving weekend, I got a lot of knitting done. But I still have a ways to go.

Here's the update:

Baby Bolero (not actually a Christmas gift, but a 'Welcome to World Little One' gift) - One sleeve done and about 1/2 inch away from finishing the second one. Then it's all about seaming and the edging.


Gaiter - several inches into it and almost done with the first skein. I'm not letting myself even get a measuring tape near it until I'm halfway through the second skein.

Other projects - still the same. Nothing new to report.

No comments: